中文
English
0311-80698857
HOME
About Us
Product
News
Case
Honor
Contact

News

The current position:Home-News

Operation specification for side unloading rock loader

Release time:2021/05/12
Operation specification for side unloading rock loader

  1 cycle process: bucket falling down, inserting rock pile → filling bucket → machine back → bucket side incline → bucket reset → bucket arm lowering bucket falling bucket → machine continues to move forward. When the bucket falls, it should be noted that the whole machine should be kept as level as possible with the ground, so as to avoid the front support of the fuselage.

  2. The operation shall be smooth and accurate, and the scattered gangue on the front road shall be cleaned with bucket first.

  3. At the beginning, the valve shall be opened large and stable in the middle stage. When the cylinder or bucket is in place, the hand shall be released accurately and timely to make the valve return to zero position, and the cylinder shall be released in time to prevent impact.

  4. During operation, it is necessary to achieve "three accuracy", "four attention", "five strictly prohibited" and "six not installed"

  "Three accuracy": the bucket shall be landing accurately, the back loading and driving shall be accurate, and the bucket turnover cylinder shall be accurate“ 4. Attention: pay attention to the surrounding personnel, pay attention to not colliding the wall and shed legs, and pay attention to the machine not to press the cable.

  "Five strictly prohibited": it is strictly forbidden to maintain the machine under the bucket without power failure, locking or sleeper cushion. It is strictly forbidden to use the machine to dump rock frequently when there is no mining car, and it is strictly prohibited to dig water ditch with bucket, and to carry out shoveling operation when the bucket is standing at the side of the bucket, and to use bucket to punch large rocks.

  "Six not installed" is larger than 400mm gangue, machine is not installed in case of disease, sh07 lighting is not not good, unloading distance is greater than 10

  Meters are not installed, unattended cable is not installed, and top support is not installed.

  5 the driver shall use the handrail to put on the machine, and it is forbidden to pull the operating handle of multi-channel valve horizontally and step on the hydraulic oil pipe.

  Side unloading rock loader

  6. The driver shall sit correctly, focus on it, hold the operating handles on both sides with the left and right hands respectively. Take care of the front and rear supporting equipment, personnel and cables according to the different operation process of the machine.

Copyright:Hebei Huazhen Coal Mining Machinery Co., Ltd          ICP record number:In the process of filing